Project Details
WFT Engineering prepared existing condition AutoCAD drawings
for the mechanical, electrical, plumbing, and fire protection
systems installed in the facility.
As part of the design team, WFT Engineering provided support
for the architectural design in the form of new mechanical,
electrical, plumbing, and fire protection systems required
to comply with current code requirements and bring the hotel
into compliance with new owner requirements. The work included
a complete redesign and expansion of the main electrical room
to fulfill the retail and hotel requirements for the complex.