AES Corporation - Arlington, Virginia  

Project Details

WFT Engineering provided complete mechanical, plumbing, and electrical design for a 23,500 sf floor build-out in a multi-tenanted office building to suit the requirements of the AES Corporation. WFT Engineering previously designed the mechanical, plumbing, and electrical systems for two other floors in the building. Design was completed in July, 2006. The space was primarily closed offices and open work areas plus the normal support areas associated with large corporate tenants, including pantry and server room. The design team members performed a thorough site survey prior to design. This, plus attention to detail during design, resulted in a thorough set of permit/construction documents as evidenced by the notably few permit review comments and contractor RFI’s during construction.


Commercial Interiors
  HMS Host
  Wilson Sonsini Goodrich & Rosati
> AES Corporation
  Steptoe & Johnson, LLP
  Rockville Metro Plaza Complex
  Hilton International Headquarters
Government
Healthcare / Laboratory
Mission Critical
Hospitality
Renovation
Studies
Base Building
Education





9737 Washingtonian Boulevard, Suite 588 - Gaithersburg, MD 20878   Phone: 301/230-0811    Fax: 301/330-8911
© 2010 WFT Engineering | email: wft@wfteng.com | web: www.wfteng.com