Recently Mr. Sullivan was a featured
speaker for the 2009 General Membership Meeting with IREM
(Institute of Real Estate Management) Northern Virginia Chapter
77. He presented “how to read mechanical, electrical and plumbing
drawings.
As the owner of WFT Engineering, Reardon Sullivan, PE, LEED®
AP, received the 2008 Design Excellence Award from the
Design Leadership Council, Washington, DC.
Winner of the 2008 Washington Building Congress Craftsmanship
Award for The SIFMA Project.
Winner of the 2006 Washington Building
Congress Craftsmanship Award
for The Cabot Tech 2N System Upgrade.
Winner of the 2000 Washington Building Congress Craftsmanship
Award
for The Bell Atlantic (Verizon) Woodley Dial Center Switchgear
Mods project.
Testimonials:
 |
 |
 |
 |
Dear Darrell,
It is a nice reward to be able to say that we work on that
project together and that it is unique. I’m personally very
excited that it’s the first LEED certified hotel in the US.
It was great to work with you and WFT. I’ve recommended WFT
to other architects both here at OPX and at other firms, and
I’m glad to be working with WFT on the Hines_ACF project.
I know we’ve been talking about having lunch for a long time.
We need to make a plan. Since we’re both on the red line,
we should meet somewhere in between our two offices—perhaps
Friendship Heights or Bethesda.
OPX Architects
21 Dupont Circle NW
Washington DC 20036
Happy New Year,
I wanted to take a moment and thank you and your team for
a great job on WSGR’s DC office. As we know, the project was
a challenge from the start with many changes and hurdles.
Your team never missed a beat and responded as needed to maintain
the schedule and the design integrity. Personally, it is a
comforting feeling to have WFT as part of the team and we
look forward to a long relationship on future projects. My
best to all for the new year!
Regards,
CB Richard Ellis
Project Management
555 1th Street, NW, - Suite 300
Washington, DC 20004
I just finished a job with WFT Engineers who
successfully designed and provided MEP technical support within
an aggressive schedule. If any of you guys are looking for
a really responsive MEP firm to work with, I highly recommend
them.
IA Interior Architects
3210 Grace Street NW
Washington DC 20007
A big heartfelt thank you to WFT Engineering
for meeting our deadline for Andrews Kurth. We appreciate
everyone's efforts meeting the schedule and getting the drawings
done.
Thank you.
AIA Gensler
Design & Planning Worldwide
2020 K Street NW, Suite 200
Washington, DC 20006
|